Search in English using key terms—avoid full sentences or unnecessary words like 'connectors' (e.g., 'and,' 'because').
Unlike AI search engines, this tool matches exact terms found in document titles, scope, and thesaurus entries.
If you don’t find relevant documents, contact us at contact@cetie.org.
Guidelines No. 5
First edition
Published on: 01/01/1991
Quality control on the bottling line
Scope of application
The objective of this document is to determine how, on a bottling line, to ensure the quality of the finished product:
Product conforms to the consumer's expectations (minimum of defects);
Optimum productivity (minimum of disruptions).
Table of contents
First Part: General Considerations
1.1 The Bottling Line: Components and Quality Factors
1.2 The Human Factor in Bottling Quality
1.3 Designing a High-Quality Bottling Line
Second Part: Inspection and Sorting Methods
2.1 Inspection Equipment
2.2 Inspection Methods
SAINT GOBAIN EMBALLAGE, MARTELL&CO, PERRIER S.A., LA GIRONDINE S.A.,ESIEC REIMS, CUSENIER, IMPRIMERIE RUEL.
Document under responsibility of working group:
Bottlers/fillers and glass manufacturers
WG chair: To be elected - -
This joint group aims to coordinate the production of documentation at the junction of the glass container production and bottling/filling. It includes good practices, the use and storage of glass containers, and quality management on bottling lines. This joint group also provides an opportunity for bottlers/fillers to open discussions on specific work items of the permanent glass groups